<ruby id="lbdvh"><fieldset id="lbdvh"></fieldset></ruby>
<sub id="lbdvh"><p id="lbdvh"></p></sub>
<thead id="lbdvh"></thead><pre id="lbdvh"><strike id="lbdvh"><dl id="lbdvh"></dl></strike></pre>

<sub id="lbdvh"><p id="lbdvh"></p></sub>

    <em id="lbdvh"><option id="lbdvh"><nobr id="lbdvh"></nobr></option></em>
    caoporn免费视频公开,精品人妻系列无码天堂,欧美亚洲另类自拍偷在线拍,国产男女猛烈无遮挡免费视频网址 ,人妻聚色窝窝人体WWW一区,色成年激情久久综合国产,伊人久在线观看视频,人人爽人人爽人人片av东京热
    歡迎訪問沁陽市晨光實業有限公司官方網站!

    沁陽市晨光實業有限公司

    行業新聞

    秉持著堅持品質、責任、精心、執著的理念,致力成為您滿意的合作伙伴,為客戶提供完善的產品和服務。

    位置:首頁 > 行業新聞

    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:5184次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    主站蜘蛛池模板: 一本色道久久综合熟妇人妻| 亚洲欧美精品一中文字幕| 青青草原国产精品啪啪视频| 治多县| 女人腿张开让男人桶爽| 99精品高清在线播放| 国产亚洲精品久久77777| 激情综合色综合啪啪开心| 久久月本道色综合久久| 精品视频一区二区福利午夜| 国产麻豆一精品一av一免费| 国产在线精品欧美日韩电影| www插插插无码免费视频网站| 婷婷四虎东京热无码群交双飞视频| 国产日韩一区二区天美麻豆| 欧美福利在线| 天啦噜国产精品亚洲精品| 午夜福利你懂的在线观看| av大片在线无码免费| 亚洲第一国产综合| 疯狂做受xxxx高潮欧美日本| 精品久久久久久无码人妻蜜桃| 亚洲成av人片一区二区| 久久夜色精品国产噜噜亚洲sv| 4hu44四虎www在线影院麻豆| 国产成人精品无码播放| 国产一区二区三区在线观| 亚洲精品动漫一区二区三| 奇米影视7777久久精品| 亚洲性日韩精品一区二区| 亚洲乱码中文字幕小综合| 一区二区三区人妻无码| 国产a在视频线精品视频下载| 国产欧美另类久久久精品不卡| 猫咪AV成人永久网站在线观看| 国产午夜福利一区二区三区| 国产欧美日韩高清在线不卡| 成人3d动漫一区二区三区| 亚洲精品有码在线观看| 蜜桃视频在线观看网站免费| 欧美牲交a欧美牲交aⅴ图片|